All-in-One Prefabricated Substation Cabin for Electric Power Distribution System

Product Details
Customization: Available
Application: Power
Phase: Three
Manufacturer/Factory & Trading Company

360° Virtual Tour

Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
National Award received
This supplier had received national award, you can check the Audit Report for more information
to see all verified strength labels (27)
  • All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
  • All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
  • All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
  • All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
  • All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
  • All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
Find Similar Products
  • Overview
  • Overview
  • Product Description
  • Specifications
  • Detailed Photos
  • Company Profile
  • Exhibition
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
NSYZC
Core
Core-type Transformer
Cooling Method
Dry Type/Oil Immersed Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, ISO9001, CCC
Usage
Combined Transformer, Power Transformer, Distribution Transformer, Substation
Frequency Characteristics
Power Frequency
Shape of Core
Ring
Brand
Han′s Power
Working Altitude
≤ 3000m
Environmental Temperature
-45 ºC~+45 ºC
Customization Service
OEM/ODM Provided
Transport Package
Wooden Case / According Customers′ Demands
Specification
50kVA - 5500kVA
Trademark
Han′s Power
Origin
China
HS Code
8537209000
Production Capacity
100PCS/Month

Product Description

Overview


All-in-One Prefabricated Substation Cabin for Electric Power Distribution System

Product Description

New energy integrated prefabricated substation cabin

NSYZC Series

 
All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
NSYZC new energy prefabricated cabin is an integrated and modular energy equipment that pre-assembles core components such as photovoltaic power generation, wind power generation, energy storage system, intelligent monitoring into a sturdy cabin.

Through the design of prefabricated cabins, users can quickly deploy, simplify installation, and flexibly configure new energy systems, realizing the efficient energy utilization and clean power supply. New energy prefabricated cabins are suitable for various scenarios that require stable, reliable, and clean power supply, such as residential communities, industrial parks, commercial centers, transportation facilities, remote areas, etc. It can serve as an independent energy supply system or be combined with traditional power grids to form a complementary power supply mode, improving the reliability and sustainability of energy supply.

With the continuous development and popularization of new energy technologies, new energy prefabricated cabins will play a more important role in the future energy field, promoting the optimization and sustainable development of energy structure.



Working conditions:
 
  1. Altitude: ≤ 3000 meters;
  2. Environmental temperature: -45 ºC~+45 ºC
  3. Environmental humidity: The daily average relative humidity should not exceed 60%, and the monthly average should not exceed 90%;
  4. Installation location: A place without fire, explosion hazard, chemical corrosion, and severe vibration.
 
Specifications
 
Part Configuration Details Descriptions Material
Underframe
assembly
Beam 4mm SPA-H
Edge beam
longitudinal beam
16/18/20#U-steel or 160*80*4 rectangular tube 3mm/5mm Q235B
Floor 3mm/5mm Panel Q235B
Front wall
assembly
Front wall pillar 6mm bent piece SPA-H
Top beam Rectangular tube 60*3 Q235B
Bottom beam 16#U-steel Q235B
Front wall pane 1.6/2mm Eight character board SPA-H
Rear panel
assembly
Rear wall pillar 6mm bent piece SPA-H
Rear wall top beam  ectangular tube or equivalent structural component Q235B
Rear wall bottom beam 16#channel steel or equivalent structural components Q235B
Container door
panel assembly
Rear door frame Frame 100*50 rectangular tube;Bend 3mm up and down Q235B
Rear door panel 2mm,36(3wave plate) SPA-H
Rear door seal EPDM waterproof sealing strip  
Door lock Lock rod,galvanized container lock rod  
Left/Right
Assembly
Left roof beam Rectangular tube 60/80*3 Q235B
Side panel Container side corrugated board 1.6mm,36(5 corrugated boards) SPA-H
Box top assembly Boxtop plate Container roof,2mm,5 waves SPA-H
Strengthen the beam Rectangular tube 60*3 Q235B
 
Detailed Photos

 

All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
 
Company Profile

All-in-One Prefabricated Substation Cabin for Electric Power Distribution System

All-in-One Prefabricated Substation Cabin for Electric Power Distribution SystemAll-in-One Prefabricated Substation Cabin for Electric Power Distribution System
 
Exhibition

All-in-One Prefabricated Substation Cabin for Electric Power Distribution System


Product applications
All-in-One Prefabricated Substation Cabin for Electric Power Distribution System 
Certifications
  • ISO 9001
  • ISO 14001
  • ISO 45001
  • ISO 50001
  • 68 Patents

All-in-One Prefabricated Substation Cabin for Electric Power Distribution System
FAQ

1. Are you the manufacturer or trader? 
HANS POWER is a professional manufacturer in power
transmission and distribution products for over 20 years. 

2. What's your major product? 
Oil immersed transformer, Dry type transformer, Transformer
substation, High and low voltage switchgear. 

3. What's the payment terms? 
T/T, LC or Cash

4. How long the lead time will be? 
It depends on the product and quantity of the order,
usually it takes 15~40 working days. 

5. Can your products be customized? 
Sure, we provide OEM&ODM service. 

6. How is your package? 
Sturdy wooden box package, or any other packages
according to customer's requirements.

7. What certifications do you have? 
ISO9001, ISO14001, ISO45001, ISO50001 certificated.
And complete test reports for products. 

8. How long is the guarantee? 
We offer at least 1 year guarantee.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier